Datacenter Pipeline
Investment and partnership opportunities in Europe and the United States
Pipeline Overview
Scope
Europe + United States
Positioning
Hyperscale, AI, HPC, Neo-cloud
Typologies
Powerland, Greenfield & Brownfield
Status
Pre-dev to Ready-to-build
France - Main Pipeline
Strategic Hub - Lyon Region
Southeast
Type: Powerland / Hyperscale
Capacity: ~200 MW IT
Status: Building permit filed / Permitting in progress
Positioning: AI / HPC / European Cloud
Key points:
- Reduced development risk
- "Institutional grade" capacity
- Market under high tension
- Credible alternative to Paris
Hyperscale Land - Normandy
North (Paris / UK Corridor)
Type: Greenfield Hyperscale
Land: >10 hectares
Capacity: >100 MW potential
Positioning: Northern Corridor with access to submarine cables
Assets:
- Rare and scalable land
- Hyperscale compatible
- International connectivity
- Long-term infra investor
HPC France - Northern Region
Somme
Type: HPC / Sovereign / Modular
Capacity: 5 to 20 MW IT
Land: ~33,000 m²
Time to build: ~15 months
Features:
- Building permit ready
- Studies completed
- Territorialized HPC
- Defense / Research / Industry
Multi-site Pipeline France
Cumulative capacity: >1 GW IT potential
| Region | IT Capacity | Typology |
|---|---|---|
| South (Provence) | ~140 MW | Hyperscale |
| West (Brittany) | ~140 MW | AI / Cloud |
| North / East | 120–180 MW | Hyperscale |
| Île-de-France (outskirts) | 10–30 MW | Edge / AI |
| South-West | 12–120 MW | AI mix |
Status: Pre-development with land reservation in progress and ENEDIS / RTE discussions
Italy - Northern Hub
Venetian Region - Strategic DC
Veneto
Type: Hyperscale
Gross capacity: Substation 270 MW
Target IT capacity: ~100 MW
Connection: 380 kV line
Advantages:
- Strategic Adriatic Hub
- Southern Europe connectivity
- International connections
- Strong cross-border potential
United States - AI Energy Campus
Maryland - Energy + AI Platform
Eastern United States
Type: Energy + AI Data Center Park
Land: ~130 acres (~52 hectares)
Initial capacity: 7.5 MW scalable to 25+ MW
Network access: 69 kV / 138 kV / 230 kV
Business model:
- GPU-as-a-service
- EBITDA >90% at maturity
- Hybrid energy + AI asset
- Highly differentiating
Key Pipeline Points
Total Capacity
+1.5 GW IT
Across the entire European and American pipeline
Timeframe
15 months minimum to 3+ years depending on project maturity
Pre-dev to Ready-to-build
Opportunities
Infra investor, hyperscaler, land sourcing, financing
Discover our services
Interested in these opportunities?
Contact our team to explore opportunities that match your strategy
Contact Us